Ken Small, REALTOR® · Century 21 First Canadian Corp., Brokerage
Ken Small Real Estate Team

Can I Build It? A Step-by-Step Guide to Additional Residential Units (ARUs) in London

Diagram of the funding stack for an additional residential unit in Ontario
January 2026 guide. London’s ADU rules, fees and permit steps below were current in January 2026. Bylaws change. Confirm with the City before you build.

UPDATED FOR 2026 MARKET CONDITIONS

In London, Ontario, you are generally permitted to add up to two Additional Residential Units (ARUs). One inside your main dwelling, one in a detached structure.

You have to meet zoning setbacks (typically 1.2m), lot coverage limits (usually 40%), and building code safety standards.

As of 2026, homeowners can refinance up to 90% of their property value to fund these builds. Development charges are largely exempt under Bill 23.

For years, building a “Granny Suite” in London felt like fighting City Hall. You battled Development Charges, restrictive zoning, and impossible financing rules. Most people gave up before they dug the first hole.

But in 2026, the doors just swung wide open.

Two things changed. The provincial Bill 23 slashed the “red tape” taxes. New federal mortgage rules allow 90% refinancing for secondary suites.

That moves an Additional Residential Unit (ARU) from “nice idea” to a math question. Run the numbers on your lot before you decide.

Maybe you want $1,800+ a month in rental income. Maybe you want to house aging parents without nursing home fees. Here is exactly how it works, what it costs, and the traps that can kill your project.

The short version
  • London allows up to two ARUs per lot — one inside the main dwelling, one detached — if you meet setbacks (~1.2m), lot coverage (~40%), and building-code safety.
  • As of 2026, Bill 23 largely exempts these builds from development charges, and federal rules let you refinance up to 90% of your property value to fund them.
  • It only pays off on the right lot. Below: the four ARU types, three funding sources, the permit checklist, and who should not build one yet.

The Rules: Can You Actually Build One on Your Street?

Before you call a contractor, you need to check your “Dirt.” The City of London has become much friendlier toward density, but the laws of physics still apply.

Here are the three “Deal Killers” we check first:

  • The Setback Surprise (1.2m): For a detached backyard suite, you typically need a minimum of 1.2 meters (approx. 4 feet) from the side and rear property lines. If you have a tight lot in Old South or a pie-shaped lot in a cul-de-sac, this setback can shrink your buildable area to zero.
  • Lot Coverage (The 40% Cap): In most residential zones (R1, R2), all structures combined (your house + garage + shed + new ARU) cannot cover more than 40% of your total lot area. If you already have a massive footprint and a pool, you might be maxed out.
  • Emergency Access: You need a clear path for firefighters (typically 1 meter wide) from the street to the backyard unit. No path? No permit.

The 4 Types of ARUs Allowed in London

You aren’t restricted to building a standalone tiny home in your backyard. The City allows structural flexibility depending on your lot layout and budget:

  • Interior Conversion: Basement apartments or converted attics within your primary home. This is the fastest, lowest-cost path to rental income.
  • Home Addition: Building a physical extension onto the back or side of your existing house.
  • Garage Conversion: Turning an existing detached or attached garage into a liveable secondary suite.
  • Detached Backyard Suite: Building a standalone structure or custom “tiny home” completely separate from the main house.

PRO TIP

Don’t guess. Check the City of London’s interactive zoning map or call Building Services. A “Grandfathered” shed does not mean you can build a permanent home in the same spot.

Financing Your Build: The 3 “Secret” Funding Sources

This is the biggest change for 2026. Two years ago, you had to have the cash in the bank or a massive amount of equity. Today, the government wants you to build these units.

Here is the “Funding Stack” savvy investors are using right now:

ADU Funding Stack Chart 2026

1. The Federal “90% Rule” (The Game Changer)

Previously, you could only refinance your home up to 80% of its value. Now, under the new federal mortgage insurance rules, homeowners adding a secondary suite can refinance up to 90% of the property’s value.

  • Why this matters: If your home is worth $800k, that extra 10% unlocks $80,000 of additional capital you couldn’t access before.
  • Protector Note: Because this is an insured mortgage product, accessing the full 90% LTV typically triggers a CMHC insurance premium. You must factor this fee into your total cost—it’s not “free money,” it’s “accessible money.”

Source: CMHC’s improved refinancing for secondary suites, in effect since 15 January 2025. Terms are set by CMHC and your lender, not by us. Confirm the current rules with your lender before you budget on them.

2. The City of London ARU Loan ($45k)

The City of London offers an interest-free loan of up to $45,000 for eligible homeowners creating additional units.

  • The Catch: In exchange for the cheap money, you often have to commit to renting the unit at an “affordable” rate for a set period. You need to run the math: Does the interest savings outweigh the rental cap?

3. The “Rental Offset” Strategy

Lenders can now use up to 100% of the projected rental income from the new unit to help you qualify for the renovation loan. The suite essentially pays for its own mortgage approval.

Cost Breakdown: Prefab vs. Custom Build

“How much does it cost?” is the wrong question. The right question is: “What are the variables?”

A backyard suite is not a shed; it is a fully functioning house with plumbing, HVAC, and insulation. To give you a realistic idea, here are two real-world London examples from the last 12 months:

  • The “Budget” Build ($215k): A 500 sq. ft. modular (prefab) unit installed in a Byron backyard. Lower cost because it was factory-built and craned in, minimizing labor delays.
  • The “Complex” Build ($320k): A similar size custom stick-build in Old North. The cost spiked due to heritage permit delays, difficult backyard access (hand-digging trenches), and luxury finishes to match the main house.
Drives Price DOWNDrives Price UP
Prefab / Modular (Fixed contracts)Custom Stick-Built (Labor/Weather risk)
Existing Services (Sewer/Water easy to reach)New Trenching (Digging 100ft to the street)
Electric Heat/Mini-SplitGas Service (Requires new line)
Standard Finishes (Vinyl/Laminate)Luxury Finishes (Stone/Hardwood)

(Note: These are estimates based on 2025/2026 London labor rates. Always get three quotes.)

The Permit Checklist: What City Hall Actually Demands

The biggest point of failure for local projects isn’t capital; it’s the paperwork. To bypass the City Hall bottleneck, your application must be airtight. Here is exactly what you or your hired professional must submit to get a building permit in London:

  • Scale Site Layout Plan: Showing your exact lot coverage percentages, landscape open space coverage, and any extended parking areas.
  • Architectural Floor Plans: Detailed structural drawings noting fire separations, ceiling heights (overall and under ducts), egress windows, and room names.
  • HVAC Design Layout: Must be drafted and signed by a qualified designer with a Building Code Identification Number (BCIN).
  • Engineered Roof Truss Package: Stamped by a Professional Engineer if you are building a new roof structure or detached suite.
  • Lot Grading Plan: Required for detached units to prove stormwater and downspouts do not push water onto adjacent properties.

Common questions about building an ARU in London

Will an ARU increase my property taxes?
Yes. Development charges are exempt, but adding liveable square footage increases your overall property assessment value. That assessment is managed by MPAC, which will adjust your final tax bills accordingly.

How many bedrooms am I allowed to build?
Under London’s current Interim Control By-law (CP-1600-300), sizes are capped. The stated purpose is to protect local neighbourhoods.

  • Each ARU is limited to a maximum of 2 bedrooms.
  • There is an absolute cap of 3 bedrooms total across all accessory buildings on the property.
  • The unit’s gross floor area cannot exceed 80% of your primary home’s floor area.

Does my new rental unit get its own municipal address?
No. The City does not sever or create a new street address for the property. You must register a secondary unit number with Canada Post. That keeps fire, emergency services, and mail delivery working.

Who Should NOT Build an ARU Right Now?

I am a real estate agent, so I usually tell people to add value. But as your “Protector,” I have to tell you when to stop. Do NOT build if:

  1. You plan to move in < 3 years: You likely won’t recover the full $250k construction cost in resale value that quickly. This is a long-term hold or cash-flow play.
  2. You cherish total privacy: Tenants mean noise, shared driveways, and eyes in your backyard. If you hate neighbors, do not move one onto your lawn.
  3. Your lot is “Legally Wet”: If you are near the Thames River or a floodplain (conservation authority land), obtaining a permit can be impossible, regardless of zoning.

How to Find the Perfect “ARU-Ready” Property

Most listings on Realtor.ca don’t list “Zoning Depth,” “Sewer Grade,” or “Side Yard Clearance.” They just list “Big Backyard.” That is dangerous. You can buy a house with a huge yard, only to find out a municipal easement prevents you from digging.

If you are looking for a property specifically to generate income or house family, you need the right dirt.

This is where our VIP Home Hunter Service™ comes in.

We don’t just look for “Nice Kitchens.” We scan the market (including off-market homes) for:

  • Wide Lots (for easy construction access).
  • R2/R3 Zoning (Pre-approved density).
  • Existing “Rough-Ins” (Saving you $10k in plumbing).

We find the asset that makes the math work, so you don’t have to fight the City Hall uphill battle.


Next Steps

You have two choices:

  1. Guess and Hope: Call a contractor and hope your zoning allows it.
  2. Plan and Profit: Get the facts first.
DOWNLOAD THE ARU FEASIBILITY CHECKLIST

(A simple 5-minute “Yes/No” PDF tool)

Or, if you are ready to find a property with “Granny Suite Potential,” book a strategy call with us below. We’ll look at the numbers together.

Book Your Strategy Call »
The honest takeaway
The rules opened up, but an ARU is still a build — permits, setbacks, and real cost. It rewards the right lot with the right numbers, not every lot. Run the math before you fall in love with the idea.
A live example
Curious what your lot could support — or what an ARU would do to your home’s value? Ken will run the numbers with you before you spend a dollar on plans.

Related articles

Next step in your planSee what your property is worth →

Not intended to solicit buyers or sellers currently under contract. All data approximate. Serving London & surrounding Southwestern Ontario.

Read this every week? Add us as a preferred source on Google and our London market pages show up first.

Leave a Reply

Your email address will not be published. Required fields are marked *